Our Tariffs

Below are our tarriffs...

1. Water tariff per month Charges in Kes
Where no meter is installed 500
0-6 Cubic Metres (M3) 330
6-20 Cubic Metres (M3) @ 65 per unit
21-50 Cubic Metres (M3) @ 80 per unit
51-100 Cubic Metres (M3) @ 100 per unit
100-300 Cubic Metres (M3) @ 120 per unit
Over 300 Cubic Metres (M3) @ 140 per unit
Metered Water kiosk @ 35 per unit
Bulk sale to a WSP @ 39 per unit
  2. Water tariff per month (schools)  
Not exceeding 600 M3 @ 40 per unit
1) Water tariff per month. New charge in Kes.
Between 600-1200 M3 @ 50 per unit
Exceeding 1200 M3 @ 90 per unit
3. OTHER SERVICES  
(a) For special reading of a meter 200
(b) For cutting off the supply at the request of a consumer 200
(c) For turning on the supply otherwise than in respect of a first connection 200
(d) For turning on the supply after disconnection for non payment 500
(e) For testing a meter at the request of the consumer where it is found to register incorrectly to any degree exceeding 5 percent. Minimum 500
4. Monthly meter rents fixed charges Kes
(a) All meters of nominal size up to 15 mm. 50
(b) All meters of nominal size up to 20 mm 50
(c) All meters of nominal size up to 25 mm. 250
(d) All meters of nominal .size up to 38 mm 250
(e) All meters of nominal size up to 50mm 250
(f) All meters of nominal size up to 63 mm. 450
(g) All meters of nominal size up to 75 mm 450
1) Water tariff per month New charge in Kes
(h) All meters of nominal size up 100 mm 800
(i) All meters of nominal size up to 15O mm. 800
5. Deposits Kes
   
(a) Domestic consumer 1,000
(i)  less than 50 cubic metres 1,000
(ii) between 50 to 100 cubic metres 2,000
(iii)between 101 to 150 cubic metres 2,500
(iv)   more than 150 cubic metres� 3,000
(c) Retail shops, workshops and offices more than 10 cubic metres 3000
(d) Bar. restaurant and lodgings more than 15 cubic metres 5,000
(e) Hotel class "A" and "B" less than 150 cubic metres� 10,000
(f) Hotel class "C" and "D" more than 150 cubic metres� 15,000
(g) Hospitals more than 150 cubic metres 20,000
(h) Minor construction site (temporary connection) less than 200 cubic metres 10,000
(i) Large construction site (temporary connection) more than 200 cubic metres 50,000
(j) Light industries less than 200 cubic metres 10,000
(k) Medium industries 200 to 300 cubic metres 15,000
1) Water tariff per month New charge in Kes
(1) Heavy industries more than 300 cubic metres 20,000
(m) Health centers/dispensaries less than 150 cubic metres 5,000
(n) Schools/colleges/other institutions more than 200 cubic metres 10,000
(o) Schools less than 200 cubic metres 5,000